Data Center Acoustic Engineering Report — Building Permit Requirement (HB6139)
Current understanding
To be populated as evidence accumulates.
Evidence log
- 2026-06-25 — Businesses: other; requirements for data center decommissioning, dismantling, and remediation; provide for. Amends 1939 PA 3 (MCL 460.1 - 460.11) by adding sec. 10jj. TIE BAR WITH: HB 6135’26, HB 6140’26, HB 6141’26, HB 6137’26, HB 6138’26, HB 6139’26: HB6142 (tie-barred companion) adds end-of-life obligations — decommissioning, dismantling, and remediation — under 1939 PA 3, bookending HB6139’s construction-permit acoustic requirements at the start of the data center lifecycle. (novelty: 3)
- 2026-06-25 — Construction: permits; acoustic engineering report for data center; require to receive building permit. Amends 1972 PA 230 (MCL 125.1501 - 125.1531) by adding sec. 10a. TIE BAR WITH: HB 6135’26, HB 6140’26, HB 6141’26, HB 6137’26, HB 6138’26, HB 6142’26: HB6139 introduced: amends 1972 PA 230 (MCL 125.1501–125.1531) by adding Sec. 10a to require an acoustic engineering report as a prerequisite for a data center building permit; tie-barred to HB6135, HB6137, HB6138, HB6140, HB6141, and HB6142. (novelty: 3)
Open questions
Related
Contributing findings
Businesses: other; requirements for data center decommissioning, dismantling, and remediation; provide for. Amends 1939 PA 3 (MCL 460.1 - 460.11) by adding sec. 10jj. TIE BAR WITH: HB 6135'26, HB 6140'26, HB 6141'26, HB 6137'26, HB 6138'26, HB 6139'26
25-jun-2026
novelty 3
per-area 2
mentions
Construction: permits; acoustic engineering report for data center; require to receive building permit. Amends 1972 PA 230 (MCL 125.1501 - 125.1531) by adding sec. 10a. TIE BAR WITH: HB 6135'26, HB 6140'26, HB 6141'26, HB 6137'26, HB 6138'26, HB 6142'26
25-jun-2026
novelty 3
per-area 3
introduces