State Energy Security Plans (SECURE Grid Act)
Current understanding
To be populated as evidence accumulates.
Evidence log
- 2026-08-31 — Declaring a National Emergency To Secure the United States Bulk-Power System: cross-connection with bulk-power-system-security: National emergency declaration on the bulk-power system complements state-level energy security planning under the SECURE Grid Act framework. (novelty: 4)
- 2026-07-29 — A bill to amend the Public Utility Regulatory Policies Act of 1978 to support microgrids, and for other purposes.: cross-connection with microgrids-purpa-support: Microgrids are a common resilience measure referenced in state energy security planning and grid reliability policy. (novelty: 2)
- 2026-07-13 — SECURE Grid Act: SECURE Grid Act (HR7257, 119th Congress) extends the DOE state energy security plan authority through FY2031, clarifies DOE is not required to approve state plans, requires DOE to provide technical assistance on request, and expands required plan content to address weather-related threats, electricity equipment supply-chain risks, and security of both local distribution (≤100 kV) and bulk-power systems; a GAO report is required. (novelty: 2)