Build More Power Act
Current understanding
To be populated as evidence accumulates.
Evidence log
- 2026-10-26 — NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War: cross-connection with nrc-doe-dow-demonstration-reactor-licensing: The licensing shortcut advances the same policy goal of accelerating new reactor deployment pursued by the Build More Power Act. (novelty: 3)
- 2026-04-14 — Build More Power Act: H.R. 8262 (Build More Power Act) introduced in the House and referred to the Energy and Commerce and Science, Space, and Technology committees; no legal effect yet pending committee action. (novelty: 2)